LED guardrail pipe installation methods and attention to detail
Release date:2012-11-29

 

LED guardrail pipe installation methods and attention to detail

Main material: LED guardrail lamps; guardrail lamps installed clamp, waterproof transformer, LED guardrail lamps master, LED guardrail lamps sub-controller,

Supplementary materials: male and female plug UTP cable, two wire power cord, self-tapping screws, rubber

LED external control fence light installation steps:

First step: the first LED guardrail lamps installed on the wall: punch on the wall mounted expansion screw, then install the LED guardrail lamps, with self-tapping screw lock; distance between the guardrail lamp according to the customer's requirements. determined; 1CM to 3CM.

Step 2: LED guardrail lamp signal lines, power lines and then docking, signal lines are generally four-core or five-core has two cores of the male and female plugs; power cord plug is a male and female of the two core;

Step 3: Install the power supply (transformer or switching power supply); calculated each transformer power transformer power guardrail lamp with the number of fence light; such as 108 colorful LED lights guardrail lamps 10W / M; 144 lights LED guardrail lamp is 12W / M; 400W waterproof transformer with 108 lamps 36M tube; 144 with 32 M tube lights. If the transformer with 36M tube; transformer is placed in the middle of 18 and 19, then two lines out, with 18 on each side. Note: 1. Transformers are generally used only 80% to 90% power; 2. Regardless of the power transformer on each side then the tube is preferably not more than 25M; the LED guardrail more back to the power wires power loss; the lower the lamp brightness;

Step four: LED fence light controller installed; taking first sub-controller, sub-controller directly connected to the LED guardrail lamps; generally three outlet ends of the sub-controller head, one end of a power cord 24V or 12V, note that this power supply line only the sub-controller of the power supply, the power supply of the fence tube to another coupling, the other one end two lugs one from the master input signal line, a signal output connected to the guardrail tube line, will be marked on the sub-controller which then master which then sub-control signal connected signal (five-pin male and female plug), power-power (two core male and female interpolation); then the sub-controller master docking of the signal, points to control and master the distance would be much UTP cable connected so that the signal is better; each sub-control only with a fixed number of LED digital tube, generally can be brought to 100M ; doing the outline of the building body, each sub-control with all the way; specific installation LED effect diagram (manufacturers will help you to reckon how many points to control each of the control with which generally have installation drawings). Also super five-wire cable between the sub-control master; cable are eight lines, male and female signal plug docking cable, now connected to the sub-control; between different loop digital control The signal line disconnected.

CopyRight © 2010  GuDing LED Lighting Zhongshan All Rights Reserved.
Address:Guzhen Town, Zhongshan City, Guangdong Province, 7 Square industrial area   

Mr Xing 15913355248     QQ:529439504

 Tel:0760-87826661    Fax: 0760-89863152